Listening to several webinars, it sounds like there is a wide range of industries and construction projects that are utilizing OpenSpace. Currently we are using it to track several large tenant improvement jobs but what type of project or industry are you using the product? What tricks have you found for capturing that type of project? For me, I've found trying to walk the same path improves my capture time and zig zagging through column sections ensure I capture the full space. Walking the same path seems to streamline when we need to go back and search for a capture. Also, a good light really helps the capture images since we all know temporary lighting doesn’t usually cover everything.
I've had a few developers approach us as well thinking this may be useful in building/campus maintenance on capturing existing conditions or even documenting projects themselves.